AMS Group complete the Hampton By Hilton Hotel, Newport

    150 150 Daniel Fountain
    • 0

    Working closely with Henry Best from Charnwood Group, James Mycroft at Hilton Hotels and Edward Davies Construction, AMS Group ensured the project ran smoothly from start to finish. The 127 bedrooms showcases the latest design developments by Hilton and offers a high-end four star feel to a two/three star brand. The bedroom fit out took around five weeks and was completed in time for the September 2010 Ryder Cup, where hotel occupancy was high. Manufactured from the Redditch based factory, the furniture is made from a combination of walnut veneers, laminates and Corian, with lime green and Raspberry upholstery for the headboard. These colours are also reflected in the artwork too which adds a playful splash of colour and creates a fresh and vibrant feel to the room. Large state of the art TVs, WiFi, timber laptop trays, large comfortable sofas and luxurious soft furnishings makes for a welcoming, homely stay.

    “This project was a pleasure to undertake and complete” says Sales Director, Shelley Wilcock. “The hotel continues to prosper and we wish the team every success.”

    Daniel Fountain / 07.04.2011

    Editor, Hotel Designs

    Share

    • 0